Forty years ago, Gough 26 was the last team to arrive on the island by crane and the first to leave in a chopper.
The coastline of Gough Island consists almost entirely of sheer cliffs. The only place for a boat to land is on a narrow boulder beach in Quest Bay. This is where the first base was established in the early 1950’s. Situated at the bottom of a steep gorge known as The Glen, and hemmed in by walls of volcanic rock, it was no site for a weather station. The single piece of coastal plateau where buildings and a radio mast could be erected was the relatively level area above Transvaal Bay. To overcome the problem of bringing supplies, construction material, as well as personnel, to the new site, a crane was positioned on the clifftop forty meters above the sea. From then on, everything that came ashore was transported by raft from ship to the base of the cliffs, and then hoisted up on a pallet in a rope net. This proved a laborious, time-consuming process and only possible when the sea was calm.
As the material was offloaded from the ship, we formed teams of four and spent three days carrying the foam sections and the bundles of planks from the landing stage in front of the crane to the helipad site. The contingent of PWD (Public Works Department) artisans then set to work constructing the helipad on the area that we had helped to clear of ferns and level with mattocks and spades.
Once the work had been completed, the workers and scientists caught the last crane and the Agulhas departed for Cape Town, leaving us to our welcome solitude.
The brand-new helipad served as a spacious exercise area until the ship returned and the first helicopter landed on the island.
Looking back at the island before landing on the Agulhas and returning to Cape Town
No comments:
Post a Comment